Boston Logan International Airport Terminal E Modernization, 2017-2023
"• Client: Massachusetts Port Authority (Massport)
• Architects: luis vidal + architects (vision architects) in association with AECOM (AoR)
• Constructor: Suffolk
• Consultants: Thornton Tomasetti / Simon Design Engineering / Arora
Engineers / GEI Consultants / Dharam Consulting / Rider Levett Bucknall /
Collabortive Lighting / Ricondo / BNP Associates / Code Red
• Area: 390,000 sq. ft. (320,000 sq. ft. new terminal + 70,000 sq.
ft. renovated space)
• Stage: Built
• Team: Joao Abreu – María José Araya – María Astiaso – David Ávila – Francisco Alvar Barrera – Nuria Campillo – Tania Estay – Jesús Gallego – Sandra González – Krists Karklins – Claudia Leal – David López – Natalia Moreno – Nicolás Orellana – Enrique Pérez – Daniela Rojas – Patricia Rojas – Francisco Rojo – Ángel Ruiz – Eduardo Sánchez – Francisco Sanjuán – Gabriel Sgorbini – Javier Torrecilla – Óscar Torrejón – Ítalo Veas – Marcos Velasco – Luis Vidal”